Casa Niebla, a hillside house by PAGX Architecture
Houses for steep ground, wet forests and long evenings. One studio from the first site walk to the night the lights come on.
Casa NieblaHillside house, 410 m²Concept, 2026
We start with the ground,not the drawing.
Before a single line, we walk the site at three times of day and dig two test pits. The slope, the water and the evening light decide where the house sits. Then we stay through the build, so what was drawn is what gets poured.
- 38houses finished
- 11years on hillsides
- 1team, from survey to keys

- 01
4:10 pm
Grey light, wet grass. The plinth is set into the slope, not on it.
- 02
5:05 pm
The larch goes from brown to black as the light drops. The tie holes in the concrete stay, on purpose.
- 03
5:40 pm
The roof floats 1.4 m past the glass, so the rain never reaches it.
- 04
6:15 pm
Fog comes down from the trees. The living room is the first lamp on.
- 05
6:40 pm
Blue hour, every lamp on. The house it was drawn to be.
Scroll to stay until dark.
Four materials,nothing applied.
Every surface is the material itself, left to weather. No paint to renew, no cladding that pretends.
- 01
Board-formed concrete
The grain of the formwork boards and the form ties, kept as poured.

- 02
Charred larch
Shou sugi ban: burned, brushed and oiled. Fifty years without a coat.

- 03
Oak soffit
The ceiling runs out through the glass and becomes the eave.

- 04
Limestone and water
Honed slabs, a basalt edge and a pool lit from its walls.

Selected houses
Start a project
Casa Niebla
A concrete plinth dug into a north slope, a charred-timber room above it and a roof that keeps the rain off the glass.

02Refugio Cocora
03Casa Duna

Bosque House

Helecho Kitchen

The dry edge
How a house gets made
- 01
Site walk
1 dayMorning, noon and dusk on your land. Test pits, sun paths, the neighbours’ views.
- 02
Sketch
3 weeksTwo options drawn by hand and a physical model you can hold.
- 03
Drawings and permits
3–4 monthsStructure, energy and every detail drawn before the first quote.
- 04
Build
10–14 monthsOur site architect on the ground every week; one fixed contract.
- 05
Handover
1 eveningWe turn the lights on with you at blue hour, and come back after the first winter.
Tell us aboutyour land.
This is a design concept. The button opens a WhatsApp chat with PAGX Studio.
